Home

Kings High School
Bournemouth

This project was won on a limited design competition for the regeneration of the school campus. The scheme includes an ADT block, science block and dining/performance space.

ADT Block (completed 2001): Workshop areas and studios are contained beneath curved roofs supported by an elegant glulam timber structure. In line with the theme of the building as an ADT block, the structure is expressed both internally and externally, and the detailing has been carefully dealt with to maintain the simplicity. Natural ventilation, natural light and generous volume provides a quality internal environment, ideally suited to improving educational standards and performance.

Science Block (completed 2003): Designed to match the ADT Block, 4 new science laboratories and ancillary spaces are accommodated in the Science Block.